The framework stage is now complete, including gutters and facias...
The bricks have been delivered...
Saturday 12 May 2012
Tuesday 1 May 2012
Again??
This time it was the crane that got bogged on our block. Due to the fact that the builder hadn't repaired the driveway the crane driver decided it would be a good idea to try and carry the rest of the framework up to the house site by going off the driveway this is the result...
Finally the driveway has had a temporary repair...
Plumbing trenches around the house have been dug and have had all the pipes layed...
Windows have been delivered...
Plumbing trenches around the house have been dug and have had all the pipes layed...
Windows have been delivered...