Tuesday 27 March 2012

Framework Arrives


The steel framework was delivered to the block late last week.






The trenches for the water, power and telstra have all been dug.





Thursday 15 March 2012

NEWS FLASH: Truck Destroys Driveway!

Concrete pump truck arrived this morning to pour the foundations, got to pumping site and sank!





It took 7 hours for the tow truck to get it out.

We have been advised the driveway will be fixed and they will be back to do the foundations on Monday, this time pumping the concrete from the road outside our block.

Monday 12 March 2012

They're back on site!

Waffle pods being layed. Our site supervisor hopes to have the concrete poured later in the week...hope the rain stays away!

Friday 9 March 2012

Rain delays progress!



Not much they can do when the site looks like a swimming pool!




Drain working hard...






Trenches full of water...